since ‎15-03-2019
‎10-12-2019
oodaddy2
Level 1
Industry Benchmarks Report
Avatar

oodaddy2

oodaddy2
- Adobe Analytics
Hello All,Does Adobe Analytics offer a report that is similar to the industry benchmarks report in Google Analytics?

Views

3.2K

Likes

0

Replies

4
CSV Export
Avatar

oodaddy2

oodaddy2
- Adobe Analytics
Hello,When I select download as csv I am directed to a help screen, is this feature working ?

Views

860

Like

1

Replies

2
Locking row order
Avatar

oodaddy2

oodaddy2
- Adobe Analytics
I have a report that has several time dimensions, among them are today and yesterday. The report is run automatically at midnight to catch the days totals. A summary number widget catches the visits for today, a summary change widget looks at the change from yesterday to today.When I run the report manually I see this ordering With the automated report I get this orderingThis causes the widgets to show yesterdays visits, and the difference from today to yesterday.How can I lock the row position ...

Views

1.5K

Likes

0

Replies

3
Applying Segments to Canned Reports
Avatar

oodaddy2

oodaddy2
- Adobe Analytics
I would like to apply a segment to the pre-configured Next Page Flow among others is this possible ?

Views

934

Likes

0

Replies

1
Timestamp setting
Avatar

oodaddy2

oodaddy2
- Adobe Analytics
Hello All,I'm aware that timestamps are enabled by customer care, is there a way that I can I see how this is set?

Views

2.7K

Likes

0

Replies

2
Re: Add a project to a report suite
Avatar

oodaddy2

oodaddy2
- Adobe Analytics
I'm trying to set up a custom variable passed by a product called mParticle.Their docs indicate I need to connect to a report suite

Views

748

Likes

0

Replies

0
Mapping custom events (from mParticle)
Avatar

oodaddy2

oodaddy2
- Adobe Analytics
Can anyone point at a decent step by step guide to mapping custom events in Adobe Analytics. The Package sending the event is mPartcle.

Views

629

Likes

0

Replies

1
Time Spent on Site went to infinity
Avatar

oodaddy2

oodaddy2
- Adobe Analytics
Hello All,After making a minor change to my project (added one row for a time period) the average time spent on site went to infinity can anyone explain this?

Views

668

Likes

0

Replies

1
Date range with fixed - rolling dates
Avatar

oodaddy2

oodaddy2
- Adobe Analytics
Hello All,I'm wotking on a project that has a special reporting requirement. I need to set a custom date range that has a fixed starting date(1/31) and a rolling end date(today). When I try to do this it sets both dates to rolling. Any assistance is appreciated.

Views

1.2K

Like

1

Replies

1
Only 1 page of my project gets converted to PDF on scheduled send
Avatar

oodaddy2

oodaddy2
- Adobe Analytics
When I send the PDF of my project to subscribers it only prints 1 page and cuts of my table at the bottom. An suggestions ?

Views

975

Likes

0

Replies

1
Re: Add a project to a report suite
Avatar

oodaddy2

oodaddy2
- Adobe Analytics
I was just looking for the best practice for publishing. I currently send on a schedule sing scheduled reports. Is this the best approach ?

Views

687

Likes

0

Replies

0
Add a project to a report suite
Avatar

oodaddy2

oodaddy2
- Adobe Analytics
I've been reporting directly from my project, I'd like to have it as part of a report suite there is an existing report suite but it only has canned reports. Some best practices on how to report from a project would be greatly appreciated

Views

2.2K

Likes

0

Replies

4
Re: Totals from 2 date ranges are the same
Avatar

oodaddy2

oodaddy2
- Adobe Analytics
Found the problem. Adobe was only acquired this month.

Views

1.4K

Likes

0

Replies

1
Totals from 2 date ranges are the same
Avatar

oodaddy2

oodaddy2
- Adobe Analytics
I have a report that total visits over several time frames. My total for this month and since our launch in January are the same can anyone describe this behaviour ?

Views

1.6K

Likes

0

Replies

2
How can I create a dynamic date range
Avatar

oodaddy2

oodaddy2
- Adobe Analytics
I have a date range metric. It measures activity from our product launch date to today. This is a scheduled report, when I initially set the end date I used the pre-set today. When the report was generated a static end date was entered, consequently when the report ran the next day the end date was yesterday instead of today. Is there a way to automatically generate a date range of static date to today ?

Views

1.2K

Likes

0

Replies

1
Likes from