since ‎24-08-2018
‎13-09-2020
aravinthd_10
Level 1
Connecting With AEM
Avatar

aravinthd_10

aravinthd_10
- Adobe Campaign Standard
Hi,I got struck While connecting to AEM.1)How to import Lead data captured through Forms from AEM to Adobe Campaign Standard(IS is direct connection or we have to connect through database) to create workflows(Nurturing the lead)Regards,Aravinth

Views

324

Likes

0

Replies

0