Thanks Parit,
I understood that about the configuration, but was curious about the following as we have staff with varying roles for separation of duties.:
- we have staff with Editor permissions who create/edit the campaigns. They would set the specific duration (between two dates) during the creation of the A/B test.
- we have staff with Approver permissions who activate the campaigns.
If the Approver activates a campaign (A/B test) that has a duration set in it, what is the expected behavior. I know in the dashboard that the campaign shows as being active, and what I would like to know is that this means that the campaign is active and will perform the A/B test only during the duration that was set.
Thanks,
Barry