Hi,
cc @arunpatidar Jörg_Hoh smacdonald2008
Should we keep some check in existing Live Actions Handle method to skip the rollout. Or should we write a fresh Live Action. Also if a given Live Action from a rollout config is skipped is it correct to say the entire rollout for the page is skipped.
Thanks
Solved! Go to Solution.
Views
Replies
Total Likes
Hi,
I would suggest using rollout cancel for the pages which suppose to be excluded.
You have to write an event listener to attach/detach the page from the blueprint whenever there is a condition/property set to a page.
Hi,
I would suggest using rollout cancel for the pages which suppose to be excluded.
You have to write an event listener to attach/detach the page from the blueprint whenever there is a condition/property set to a page.