Your achievements

Level 1

0% to

Level 2

Tip /
Sign in

Sign in to Community

to gain points, level up, and earn exciting badges like the new
BedrockMission!

Learn More

View all

Sign in to view all badges

Visualization in Workspace

Avatar

Avatar
Validate 1
Level 1
azizs75681934
Level 1

Likes

0 likes

Total Posts

3 posts

Correct Reply

0 solutions
Top badges earned
Validate 1
View profile

Avatar
Validate 1
Level 1
azizs75681934
Level 1

Likes

0 likes

Total Posts

3 posts

Correct Reply

0 solutions
Top badges earned
Validate 1
View profile
azizs75681934
Level 1

05-12-2018

Hello Peeps,

It is my first post on here.  I am seeking some workspace assistance and need to see if anyone can guide me. 

I have been asked to create a report like below. I need 3 metrics on one graph.  With the bar and the lines- is this sort of graph possible in workspace area? Any other way to represent this in workspace?

1639954_pastedImage_0.png

Accepted Solutions (1)

Accepted Solutions (1)

Avatar

Avatar
Coach
MVP
ursboller
MVP

Likes

521 likes

Total Posts

1,020 posts

Correct Reply

256 solutions
Top badges earned
Coach
Contributor
Bedrock
Seeker
Springboard
View profile

Avatar
Coach
MVP
ursboller
MVP

Likes

521 likes

Total Posts

1,020 posts

Correct Reply

256 solutions
Top badges earned
Coach
Contributor
Bedrock
Seeker
Springboard
View profile
ursboller
MVP

05-12-2018

not exactly the same, but close to. just try the link "in as workspace project" which should be available on every report screen.

if thst doesn't work, follow those steps within a workspace project:

1) create new table with desired metric (orders) and dimension (days) having the main date range (for green bars, change on top right if needed)

2) right click on metric header "orders" and select "compare to other date range" and select the desired  date ranges for comparison. this will add new columns for the desired date ranges. remark: the dimensions on the left (rows) will stay the same. but in each cell of the new columns you will see a small date indicating whith the "compare date"

having this table just create a visualization like "bar chart" or "line".

remark: you can change the "alignment of dates" by changing the settings: open the gear icon of the dimension "day" to change from "start at same row" to "do not adjust" (or something similar, don't have access right now to check)

Answers (0)