not exactly the same, but close to. just try the link "in as workspace project" which should be available on every report screen.
if thst doesn't work, follow those steps within a workspace project:
1) create new table with desired metric (orders) and dimension (days) having the main date range (for green bars, change on top right if needed)
2) right click on metric header "orders" and select "compare to other date range" and select the desired date ranges for comparison. this will add new columns for the desired date ranges. remark: the dimensions on the left (rows) will stay the same. but in each cell of the new columns you will see a small date indicating whith the "compare date"
having this table just create a visualization like "bar chart" or "line".
remark: you can change the "alignment of dates" by changing the settings: open the gear icon of the dimension "day" to change from "start at same row" to "do not adjust" (or something similar, don't have access right now to check)