Success Events attribution through calculated metrics and eVar allocation configuration

Avatar

Avatar
Validate 1
Level 2
Advance_Analyti
Level 2

Likes

12 likes

Total Posts

30 posts

Correct Reply

0 solutions
Top badges earned
Validate 1
Boost 5
Boost 3
Boost 10
Boost 1
View profile

Avatar
Validate 1
Level 2
Advance_Analyti
Level 2

Likes

12 likes

Total Posts

30 posts

Correct Reply

0 solutions
Top badges earned
Validate 1
Boost 5
Boost 3
Boost 10
Boost 1
View profile
Advance_Analyti
Level 2

26-09-2019

Hi Guys,

I am in process of defining allocation and participation for a new report suite and i have not used attribution model in calculated segments so far. What i am trying to understand is that, if my eVar allocation is configured to last (most recent value) and if i make a calculated metric of a success event and select linear option from the attribution model.

1. If i see this eVar against my calculated success event metric in workspace, how will eVar values finally get allocated?

2. Will the calculated metric override the back end configuration

3. If it won't override, what are some other options to use the attribution model?

Thank you in Advance.

Accepted Solutions (0)

Answers (1)

Answers (1)

Avatar

Avatar
Shape 25
MVP
Andrey_Osadchuk
MVP

Likes

536 likes

Total Posts

968 posts

Correct Reply

263 solutions
Top badges earned
Shape 25
Bedrock
Coach
Boost 500
Affirm 250
View profile

Avatar
Shape 25
MVP
Andrey_Osadchuk
MVP

Likes

536 likes

Total Posts

968 posts

Correct Reply

263 solutions
Top badges earned
Shape 25
Bedrock
Coach
Boost 500
Affirm 250
View profile
Andrey_Osadchuk
MVP

27-09-2019

The attribution model (attribution IQ) overwrites the eVar configuration settings.