Seems that scheduling a monthly Work Space Report is only possible for one year.

Is it possible to change this setting? If so where can I do so?

1521475_pastedImage_0.png

Accepted Solutions (1)

Accepted Solutions (1)

Avatar

Avatar
Contributor
MVP
AlexisCazes
MVP

Likes

186 likes

Total Posts

424 posts

Correct reply

198 solutions
Top badges earned
Contributor
Shape 1
Give Back 10
Give Back 5
Give Back 3
View profile

Avatar
Contributor
MVP
AlexisCazes
MVP

Likes

186 likes

Total Posts

424 posts

Correct reply

198 solutions
Top badges earned
Contributor
Shape 1
Give Back 10
Give Back 5
Give Back 3
View profile
AlexisCazes
MVP

04-07-2018

i think it is a hard limit set for all scheduled reports. I have the same for weekly and daily scheduled reports. I would say engineers will say it is working as designed.