Your achievements

Level 1

0% to

Level 2

Tip /
Sign in

Sign in to Community

to gain points, level up, and earn exciting badges like the new
Bedrock Mission!

Learn more

View all

Sign in to view all badges

Coffee Break: Join us on Wednesday, April 5th at 10am PT to chat with Ben Gaines, Director of Product Management for Adobe Analytics. Ben will be online to answer your Analytics and Adobe Summit questions.

Link in scheduled reports using rolling date ranges should open the report with the current dates

Avatar

Level 1

27-06-2013

Currently if you schedule a report to be delivered daily via email using a rolling date range. The report attachement that you get in the daily email shows the correct dates, but if you click on the "Link to Report" to view the report within SiteCatalyst, it takes you to the date range that was used when the report was originally set up. Since you have specifically set the date ranges to "rolling" and you have scheduled the report to deliver daily, the expectation is that the link would go to the current date range and not the original. 

The ultimate experience is back.

Join us in Vegas to build skills, learn from the world's top brands, and be inspired.

Register Now